At the 2024 GE Basements & Underground Structures conference, Wentworth House Partnership managing director Stuart Vaughan will discuss the complexities involved in balancing heritage with innovation on the £300M Salisbury Square development.
Tag Archives: Wentworth House Partnership
Watch: Tideway: Overcoming technical challenges on a major upgrade of an existing sewage pumping station
At the 2022 GE Basements and Underground Structures conference, Wentworth House Partnership technical director Yueyang Zhao and Costain Vinci Bachy JV project manager Sophie Vicard discussed technical challenges on Tideway's Earl Pumping Station.
Tim Lohmann becomes Keltbray’s group director of strategic engineering
UK specialist engineering firm Keltbray has appointed previous Wentworth House Partnership managing director Tim Lohmann to the newly created role of group director of strategic engineering.
Wentworth House Partnership undergoes leadership change
Keltbray’s in-house engineering consultancy Wentworth House Partnership has appointed Stuart Vaughan and Tim Lohmann as joint managing directors of the company.
Excavation: Sensitive neighbours
The presence of key assets presented contractor Keltbray with some complex challenges on Landsec’s N2 development in London Victoria.
Watch: Tideway – Reducing temporary works through innovative design
At the 2020 GE Basements and Underground Structures conference, Wentworth House Partnership's Yueyang Zhao, Adrian Bugea and Vasileios Papastathis discussed temporary works design at the Greenwich Pumping Station site, as part of the Thames Tideway Tunnel project.